Chain-link fence calculator
The tool counts a chain-link fence by its parts. These are fabric rolls, top rail, terminal posts and line posts, plus the bars, bands and ties that hold the fabric.
Enter a length below to see the counts. Or open the designer and trace your own fence.
Try it freeTry a length
Pick a length and a number of gates. The counts come from the same takeoff the designer uses. The height box starts at 4 ft, the height the designer starts the Chain link style on. Change it to see another height. The link under the calculator starts a new design on this style; a design already saved on this device keeps its own style. Settings such as the post spacing are on the plan page, which opens when you unlock the plan.

Your count
- Sections
- 10posts at up to 10 ft
- Posts
- 12gate posts included
- Gates
- 196 ft of fence plus the gate openings
- Chain link fabric, 4 ft tall
- 2 pieces50 ft roll
Counted for one straight run with the gates spaced evenly along it: sections, posts, gates and the main material, with the designer’s waste allowance. The post spacing and the waste allowance are settings on the plan page, which opens when you unlock the plan.
A 100 ft run, worked out
These counts are for a fence 4 ft high, the height the designer starts this style on. The calculator above starts at the same height, so its first answer for 100 ft with one gate matches the table. Fabric rolls count the feet of fence, so they stay the same at another height. Tension bands change with height: there is one for each foot of height on each tension bar.
| Item | Straight run | With one 4 ft walk gate |
|---|---|---|
| Sections | 10 | 10 |
| Terminal posts | 2 | 4 |
| Line posts | 9 | 8 |
| Fabric rolls | 2 | 2 |
| Top rail lengths | 10 | 10 |
| Tension bars | 2 | 4 |
| Fence ties | 150 | 144 |
| Bottom tension wire (ft) | 100 | 96 |
| Gates (single) | 0 | 1 |
| Concrete bags | 22 | 24 |
Posts are up to 10 ft apart. Terminal posts are the posts at the ends, the corners and the gates.
What the list counts
- Terminal posts and line posts, with caps on each
- Chain-link fabric, in rolls
- Top rail, in lengths
- Rail ends, brace bands, tension bars and tension bands
- Fence ties and bottom tension wire
- Gates, with hinges and latches, and concrete for the posts
Fabric is counted in rolls of 50 ft, and top rail in lengths of 10.5 ft. Both are settings on the plan page. Change one and the count follows.
Post spacing
Chain link has the widest spacing of the styles: posts are up to 10 ft apart. You can change it on the plan page.
What it does not count
Old fence coming down is not counted. If you say there is old fence to remove, the list adds a note and nothing more: no disposal and no post removal.
The designer has a slope setting. It adds a note, and the quantities stay for level ground. The saw cut is not counted either, so allow a little extra. The tool gives no prices.
Free first
Designing is free, with no account.
Before you pay, you see a free preview: the item names and the first three quantities. The rest shows “Locked”. One payment unlocks the materials list, the cut list and the drawings.
The site owner sets the price:
Before you build
Your local building office decides what you need. Check with it before you build.
Questions
How much chain-link fabric do I need?
The tool counts fabric in rolls of 50 ft. A 100 ft run 4 ft high is 2 rolls. Change the roll length on the plan page.
How many posts does a chain-link fence need?
Posts are up to 10 ft apart. The 100 ft run has 2 terminal posts and 9 line posts.
Does it count top rail?
Yes. It counts top rail in lengths of 10.5 ft, and the rail ends and brace bands that go with it.
Does it count privacy slats?
No. The list has fabric, rail, posts, bars, bands, ties and wire. It has no slats.
Do you build decks or fences?
Put the designers on your website. Each lead arrives with the plan drawing, the measurements and the design, and you do the quoting.
See how it works for builders →These plans are a design aid, not engineered drawings. Check requirements with your local building department before you build.